Plant Capacity | 50,00,000 K Cal/ Hr |
---|---|
Air Temperature | 600 °C |
Application | Spray Drier |
Industry | Ceramic Industry |
Existing | With our Direct Hot Air Generator | |||
---|---|---|---|---|
Fuel used | Furnace Oil | Coal | Lignite | Agrowaste |
Fuel Consumption /day | 10200 L | 40000 Kg | 37000 kg | 45000 Kg |
Cost of the fuel /day (Rs/Day) Controlled supply | 3,26,400 | 1,60,000 | 1,10,000 | 1,57,500 |
Addl cost of Power & Labour / day (Rs/day) | 3,000 | 8,000 | 10,000 | 10,000 |
Total Running Costs /day (Rs/day) | 3,29,400 | 1,68,000 | 1,20,000 | 1,67,500 |
NET SAVINGS / day | 1,61,400 | 2,09,400 | 1,61,900 | |
Cost of a 50L Plant | 1,20,00,000 | |||
Payback Period | 75 days | 57 days | 75 days | |
Payback Months (Maximum) | 2.5 Months | 2 Months | 2.5 Months |